Raw Data
Raw Data
Works. 3 Aug-end of september, bus 46 diverted btw.ALBERT I and LIVERPOOL via RAAD/ CONSEIL.CLEMENCEAU moved
Cause: Construction
(10)Effect: Detour
(4)Routes (1):
gr:stibmivb:26Trips (0):
The "breadcrumbs" element is always present, on top of the page.
It shows you where you are on the lab.
It enables you to reach any page on the lab.
GtfsStop: gs:stibmivb:1487parentStation: stibmivb:s-pommierplatformCode: locationType: Stop/platform (0)description: STIBMIVB BUS PLATFORMwheelchairBoarding: 2 There exists no accessible path from outside the station to the specific stop/platform.
GtfsAgency: stibmivbLocation: 4.280497,50.834966routeTypes: 3| Id | Name | Platform | type | Lat | Lon |
|---|---|---|---|---|---|
| stibmivb:s-pommier | POMMIER | Station (1) | 50.834966 | 4.280497 | |
| gs:stibmivb:1484 | POMMIER | Stop/platform (0) | 50.835155 | 4.280397 | |
| gs:stibmivb:1487 | POMMIER | Stop/platform (0) | 50.834966 | 4.280497 |
Works. 3 Aug-end of september, bus 46 diverted btw.ALBERT I and LIVERPOOL via RAAD/ CONSEIL.CLEMENCEAU moved
(10)(4)gr:stibmivb:26Match. 16 Sep, 5pm-1am, B46 diverted btw NEERPEDE and ST-GUIDON. B75 diverted btw RENE HENRY and VAN BEETHOVEN.
(1)(4)gr:stibmivb:26gr:stibmivb:60gs:stibmivb:1487Annual market. On 15 Sep, bus 46 diverted between ST-GUIDO(N) and KUREGEM via chée.de Mons/Bergensesteenweg.
(1)(4)gr:stibmivb:26Match. 16 Sep, 5pm-1am, bus 75 diverted between RENE HENRY and VAN BEETHOVEN via avenue Marius Renard.
(1)(4)gr:stibmivb:60